Four years, one leaking bobbin mill on the Rochdale Canal, and a furniture workshop that took twice as long as it should have. On power, water, and the difference between being slow and working at the rate the work goes.
Chapter one
The lease
The room I signed for in February 2022 was on the first floor of a bobbin mill at Callis Bridge, half a mile east of Hebden Bridge, and it had been empty for nineteen months. Eighteen hundred and fifty square feet, four cast-iron columns down the middle, a goods door at the gable end with no hoist behind it, and a north wall four metres from the Rochdale Canal. The rent was £640 a month. I had costed a workshop at £1,100 and gone looking for £900, so £640 felt like being handed something. It took me two years to work out what I had actually been handed.
The picture framer who had it before me left a note taped inside the fuse box: Single phase only. Don’t trust the third socket on the west wall. He was right about both. I spent the first eight months making furniture with a mitre saw, a hand router and a borrowed welder that tripped the board if the kettle was on, and I told customers twelve weeks, because twelve weeks is what one person on a domestic ring main can honestly promise.
What I built that first year was not a business. It was thirty-four objects — stools, mostly, and four low tables — made slowly enough that each one taught me something the next one used. I still have the notebook. Beside stool eleven there is a line in pencil: tenon 2 mm shy, filled, don’t. That is the whole of my quality system for 2022.
Chapter two
Three phase
Three-phase power arrived on 4 November 2022, eleven weeks after I applied for it and £4,100 lighter than I had planned to be. The network operator wanted a wayleave for eighteen metres of cable across the mill yard, the mill’s owner wanted a reason, and the reason took six weeks to write. When the electrician finally energised the board he did it at twenty to eight in the morning, and I stood there like an idiot watching a 415-volt lamp come on.
The machines came in the order I could afford them, which is not the order anyone would advise. A 1974 Bridgeport turret mill, £2,300 from a closing tool room in Rochdale, which needed a draw bar and has not needed anything since. A Colchester Student lathe for £1,150 at auction in Wakefield, bid on the strength of one photograph, collected in the rain. An Amada press brake in March 2023, on finance, the first thing I have ever borrowed money for. The brake is what changed the work I could quote for: a folded steel leg takes eleven minutes and a fabricated one takes ninety.
The first order that felt like a business was twelve stools for a coffee roaster in Todmorden, delivered in June 2023 against a promise of ten weeks. I made them in seven. It is the only time in four years I have finished early, and I have thought about why ever since. The honest answer is that I quoted the drawing rather than the job, got lucky with the ash, and never worked out how to be lucky on purpose.
Chapter three
Water
The canal came into the building on the night of 20 December 2023. Not over the towpath, which is what I had always pictured, but up through the floor at the north-east corner and in under the goods door at the same time, so that the two met somewhere near the columns and kept rising. It stopped at 340 millimetres. I know that precisely because it left a line on the whitewash that is still there, and because I now measure everything against it.
What 340 millimetres took: the whole ash stock, eleven boards from the sawmill at Sowerby Bridge, standing on edge on the floor the way only an optimist leaves timber. The element and the fan out of the powder-coat oven. Two boxes of fixings. Six weeks of orders, which is the expensive one — nothing on that list cost as much as the phone calls did. The insurer paid for the oven in March and argued about the timber until May.
The rebuild is the only part of this story where I moved quickly, and that was because there was nothing left to decide. Everything that can rust or swell now lives on 600-millimetre galvanised stillages. The consumables are on the mezzanine. The oven sits on a plinth. The finishing bay swapped ends with the saw bay so that wet work happens near the drain and not near the timber, which is the sort of thing you would have put in the plan on day one if you had ever been flooded.
Chapter four
Rate of build
Farida joined in April 2025, out of a shopfitting firm in Rochdale, and she is a better welder than I will ever be. I had put the hire off for a year on the grounds that I could not afford it, which was true in the way most such statements are true: I could not afford it at the rate I was working. Within five months the quoted lead time went from fourteen weeks to nine, and the reason was not that we went faster. It was that two people can hold two jobs in the air at once, and one person holding two jobs is just one job being done badly twice.
There are four of us now, counting me, in the same eighteen hundred and fifty square feet, and the renewal in September took the rent to £980. We shipped 308 pieces in 2025. The quoted lead time is six weeks and we hit it about eight times in ten, which is the number I am least proud of and most interested in.
People say slow as though it were a value. It is not; it is a rate. For four years that rate was set by whichever thing was scarcest — power, then money, then dry timber, then hours — and the only real progress in any given month was noticing which one it was. The build is not finished. The oven wants replacing, the mezzanine stair is a compromise I will be paying for, and there is a stack of ash by the north wall that is four metres from a canal I now respect. But the rate has changed, and the rate is the only thing I know how to build.
Four rules
What I would tell myself in 2022
None of these are insights. Each one is a thing I paid for twice.
Rule one
Buy the machine that outlives the plan
The Bridgeport is fifty-two years old and was the cheapest thing in the workshop. The cordless kit I bought in 2022 to be quick with has all been replaced twice. Spend where the thing will still be standing when the plan it was bought for has gone.
Rule two
Quote the job, not the drawing
A drawing takes as long as it takes. A job also contains the board that moved, the delivery slot you missed, and the hour spent finding the right collet. Every early quote I lost money on was priced off the geometry alone.
Rule three
Rent is a deadline
£640 a month is not a cost, it is a clock: it tells you how many weeks of not shipping the business survives. Cheap rent bought me the room to be slow, and then hid from me how slow I was being. The month I started reading it as a deadline is the month the quoting got honest.
Rule four
Slow is a rate, not an excuse
Something is always the constraint: power, money, dry timber, hours. Say out loud each month which one it is, fix that, and let everything else stay slow on purpose. The rate is the only thing you actually control.
Evidence
Two things said to me, and one table
Single phase only. Don’t trust the third socket on the west wall.
Note taped inside the fuse box by the previous tenant, found February 2022
You’re not slow. You’re one person pretending to be a factory.
Farida Nasser, fabricator, on her second day
| 2022 | 2023 | 2024 | 2025 | |
|---|---|---|---|---|
| Rent, per month | £640 | £640 | £820 | £980 |
| Pieces shipped | 34 | 118 | 173 | 308 |
| Machine hours logged | 410 | 1,240 | 1,610 | 2,480 |
| People, including me | 1 | 1 | 1 | 3 |
| Lead time quoted | 12 weeks | 14 weeks | 14 weeks | 9 weeks |
A note on the numbers
Everything in the table comes out of the job book and the machine log, both of which I keep by hand and both of which have gaps. The 2023 machine hours are the least trustworthy: the log stops on 19 December and starts again on 4 February. Pieces shipped counts anything that left on a pallet with an invoice attached, so a set of six chairs is six. I have not adjusted the rent for inflation, because the landlord did not.
About the author
Ruth Aveling runs Callis Works, a four-person furniture workshop in the Calder Valley making steel and ash pieces to order. This is her first piece for Fieldnote.